This section consists of two 8 tons induction furnaces; each furnace can melt up to 8 tons in only 50 minutes with all the mechanical and electrical equipment. The molten temperature can reach up to 1750 C.
After the completion of the melting process, an employee of the quality control takes a model of molten and after analyzing it in the SPECTROMETER dvice. In the case of matching the results of the analysis of the constitutions used, the meal is transferred to the continuous casting section. In the case of deviation in the results, the deviation is treated by material added to the molten by type and percentage Deviation and then transferred to the continuous casting section